Attic Joist Cutter
Step 3 nail joist support boards.
Attic joist cutter. Always cover the tops of the ceiling joists to make sure the insulation is deep enough to reach your target r value and to prevent thermal bridging the heat loss that occurs through the wood framing. Work from the perimeter of the attic toward the door or hatch so that you don t trample all over the insulation you just put in. Cut new joist lumber for each of the sister joists using a circular saw. Nail 12d nails through the headers into the ends of the cut joist.
The subfloor installation is easy. The rim joist fig. This serves to. Check each joist for crowning slight bowing along the length of the board and mark the top edge to ensure that the joist is installed with the crown facing up.
Clamp the ends of the cut joist to the headers. The ceiling joists will not hold much weight being only 2x4 s. It is very easy to over cut the notches and remove the waste in two swift cuts but over cutting the notches in this manner weakens the structural integrity of the replacement lumber. Then set new joists same height as existing ones alongside the old.
Set a hydraulic jack and post under the beam and jack up the joists about 1 8 in. Note that the trimmers run the whole length of the joists in place. In situations when sistering damaged floor joists with lumber of similar dimensions it can be easy to notch and slide the sister board into place. After you ve cut and boxed the ceiling joists proceed to make a platform or.
Tack a beam under the sagging joists. Use of joists in attic flooring. Nailing two 2x4s together will work to span about three joists unless the sag is under a weight bearing wall. Precise measurement is the most difficult as you need to consider all underlying obstructions carefully before proceeding with your plans.
Covering the ceiling joists in the attic using plywood is a cheap way to make better use of the wasted space in your house. Cut 2 joist sized boards long enough to span two joists on each side of your chosen location see figure 9. Yes you can typically cut through joists but you must make some additions known as trimmers and headers to the framing as well. A day until they re level.
Modifying an attic floor s joist system is a job for the pros.