Aluminium Sliding Door Installation Manual
Standard aluminum series windows patio doors architectural manual milgard manufacturing inc.
Aluminium sliding door installation manual. Step 6 inserting sliding panel 1. Product manual sliding folding door vistafold crealco wispeco aluminium specifications concerning products and applications this manual is based on standard configurations only. Sliders on the inside. Ground level must be 100 level as illustrated in fig a a stone can cause a problem as illustrated in fig c.
Sliding door 73 installation all 450 series doors are factory sized to fit into a framed opening whether new or created by removing an existing door. Crl28510 sliding door systems crl28512 sliding door systems crl50 softbrake crl70 702c track kits laguna sliding door kits. Install the sliding panel. Sheet is notched around.
Top membrane of sliding door must be secured to lintel. Installation manual for af 25hb type aluminum frame sliding door safety precautions installation precautions this product is a hanging sliding door. Crl related installation manuals. Clean the floor of your work area so the aluminum frame of.
Put the head of the panel lip onto the outside header rail. Sliding doors are to be built in with window door beading on the outside of the building i e. Sikaflex seal between top of processed jamb section and head flashing. As there are many configurations not covered in this manual contact a wispeco technical consultant with regard to a configuration not represented herein.
Make sure that the structure is strong enough to support the door before installing the tracks. 45 45 168 frame size opening size frame size 30mm mild steel lintel 10mm clearance internal lining sealant over head. Transaction and security hardware. Installation instructions g james glass aluminium.
Sliding door system for aluminum frames. Lift the door into position top. 250t 400t 550t thermal entrance doors. Then slide rmly to the side the x panel should be on and xed into place.
Sliding doors are sunk into the floor. Doors will be 1 2 smaller than the framed rough opening to allow. Lift the screen and swing the bottom onto the panel track.