Allure Cement Siding Installation Manual
Rainscreen system must be designed to insure that all appropriate windload and anchoring requirements are met.
Allure cement siding installation manual. 0 095 x 0 235 hd x 2 long into framing 16 o c. Xxwhen using a circular saw or mechanical shears cut allura fiber cement siding face down. Allura fiber cement siding is tested in accordance with astm1186 in the u s. Allura fiber cement siding installation manual fastening requirements for allura fiber cement siding basic fastening schedule1 2 wall framing5 product fastener3 fastening4 method type spacingvertical siding 16 o c.
Manual 5 do don t 7 cutting xxuse appropriate personal protective equipment ppe. 6d siding nail 6 edges 12 in the field wood studs 2x4 min. Xxuse a polycrystalline diamond tipped fiber cement blade for circular miter and table saws. The installation techniques in this manual describe and illustrate the steps involved in installing allura fiber cement siding soffit and trim.
Make sure you keep the siding stored flat and covered when not currently in use and that you pay attention to the installation manual. Their purpose is to provide detailed information and how to tips that will simplify the installation process. Allura fiber cement siding is tested in accordance with astm1186 in the u s. Xxcut fiber cement outdoors when possible.
All installation requirements listed in the allura fiber cement siding installation manual must be met. 0 095 x 0 235 hd x 2 long into furring 6d siding nail blind nailed wood studs 2x4. With 10 gorgeous new colors and 1 new stain our outstanding color palette has now extended to 30 total colors. 6d siding nail 6 edges 12 in the field wood furring 2x4 min.
And ccmc technical guide requirements as required by the national building code of canada. Xxrefer to page 18 for details. With 10 gorgeous new colors and 1 new stain our outstanding color palette has now extended to 30 total colors. These testing standards include a stringent review of more than a dozen properties such as flexural strength moisture movement frost resistance transversal loading and water.
And ccmc technical guide requirements as required by the national building code of canada. Xxwhen using a chop saw cut the siding face up.